Wednesday, October 13, 2010

Let's Catch Up!

Sorry it has been so long. A combination of vacation, sick child, and not much visual going on conspired to take me away from the blog for a few days, but now I am back!

First up: the copper is finally here! Thanks so much to Marbleized Copper for persevering through the UPS Conspiracy of 2010. Another cheer to FedEx for coming through on a pain-free delivery. So here it is:

Swirly....

One of a kind!
Next on the agenda: appliances are starting to go in. Today our double oven (Bosch 500 series, convection in upper oven) went in, and also our fridge (Thermador Freedom 36" French Door). The panels are not on the fridge so it looks a bit funny, but it seems to be working great.

Sorry about the fingerprints!
Like I said, it looks funny.

Inside the fridge; the top shelf moves up and down at the touch of a button.

Freezer---I just checked it again and we have ice!
Third, I'd like to show you some of the stuff inside our cabinets, like the peanut-shaped things in our blind corner cabinets and the pullout trays in the pantry. Hopefully these gizmos will help with organization and also reduce the number of times I say "Oh wow, I didn't know we had three cans of artichokes back there that expired 2 years ago."
Pantry roll outs.

Peanut gizmo--there's one below as well.

New larger cabinet with peanut thingy and sectioned cookie sheet/cutting board storage.
Tomorrow is a very exciting day--the countertops and sink are being installed. I'll be sure to post photos as soon as I can!

2 comments:

  1. Things are really moving along now! Can't wait to see the counters/sink.

    ReplyDelete
  2. Those blind corner cabinets look great with those peanut thingies (aka "LeMans"). The whole kitchen is coming along nicely!

    ReplyDelete

Please be respectful and keep comments clean!

Note: Only a member of this blog may post a comment.